
-
Total $0.00
- Cure Schedule = 375F/15 min @ Part Metal Temperature
- Gloss Level = 0 – 10% on 60 Degree Meter
- Recommended Mil Thickness = 2.0 – 3.0 mils
- Specific Gravity = 1.54
- Theoretical Coverage = 51.0 sq. ft.
- Salt Spray Results = 1,000+ hours
Disclaimer: Powder Buy the Pound does not guarantee the color you see on your screen in your powder-coated jobs. Colors may vary from the actual product due to your screen resolution, viewing device and other settings outside our control. It is strongly recommended that you powder coat a sample, before applying the powder on your actual job.